fbpx
Loading Events

« All Events

  • This event has passed.

Wingra Creek Phase 3 Public Meeting

September 15, 2014 @ 6:30 pm - 7:30 pm

From Sally Swenson- City of Madison:

As you may recall, we’re proposing a project in Wingra Creek, near the Parks Maintenance Facility and Quann Dog Park.  The project will stabilize the creek banks, as well as realign the channel to provide a more natural appearance.  Realigning the channel will consist of constructing littoral shelves in a meandering pattern and dredging the channel.

 

Due to additional project requirements and increased material costs for some items, we will need to slightly revise the project.  We will be discussing the proposed changes at a public meeting on Monday, September 15th, at 6:30 p.m.  The meeting will be held in the community space of Arboretum Cohousing, located at 1137 Erin Street.

 

The channel dredging and littoral shelf (meander) construction will still occur.  What we’ll be discussing are possible material changes, dredge depth, and quantity of floating wetland installations.

 

We welcome everyone’s participation, so please feel free to invite others that may be interested.

 

Thanks,

 

Sally Swenson

City of Madison – Engineering Division

City County Building

210 MLK Jr. Blvd., Room 115

Madison, WI 53704

ph: 608.266.4862

f: 608.264.9275

Details

Date:
September 15, 2014
Time:
6:30 pm - 7:30 pm

Venue

Arboretum Co-housing
1137 Erin Street
Madison, WI 53711 United States
+ Google Map